A home rarely slips all at once. It shows up first as small things that each look fine on their own: a date that didn't get updated, a trade that moved, an invoice that didn't go out.
Here are the five we look for, what each looks like on the ground, and a quick check you can run on your own homes this week.
What it looks like: the field says one thing, the schedule still shows last week's dates, and trades start calling to ask if they're still on.
Quick check: pick three active homes. Ask the super for the next two milestones on each and compare them with what the schedule shows.
What it looks like: a trade gets pushed twice, an inspection sits waiting, a window or cabinet order has no firm delivery date, or a selection is still open.
Quick check: list every home with an open selection or a long lead item that has no confirmed date.
What it looks like: labor, deposits and materials get paid before the next draw is approved, and a request sits waiting on an inspection or paperwork.
Quick check: for each active home, write down four lines: spent, requested, approved, still waiting.
What it looks like: a stage is finished, but the draw request or invoice hasn't gone out. Change orders are built but not signed or billed.
Quick check: list the stages finished in the last two weeks and note whether a request or invoice went out for each.
Related: Milestone billing gaps
What it looks like: homes that were spaced apart now land close together, so crews, carrying costs and cash all stack up at once.
Quick check: put every projected closing on one list by month. See where they bunch up and which dates moved since last month.
One sign on one home is normal. Two or more, or the same sign on several homes, is worth a closer look across all your active homes instead of one job at a time.